1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing

Product Details
Customization: Available
Application: Industry, School, Lab
Customized: Customized
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
75379.11 USD
Terms of Payment
LC, T/T, D/P, Western Union
  • 1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
  • 1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
  • 1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
  • 1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
  • 1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
Find Similar Products

Basic Info.

Model NO.
CY-O1200-50IIT-3Z-HV
Structure
Desktop
Material
Stainless Steel
Type
Tubular Furnace
Vacuum Tube Furnace
High Purity Quartz
Tube Diameter
50mm
Tube Length
1000mm
Heating Zone Length
200+200mm
Operating Temperature
0-1100c
Gas Supply System
Gas Mass Flowmeter
Measurement Accuracy
+-0.2%
Ultimate Vacuum
1.0e-5PA
Rotary Vane Pump
1.1L/S
Molecular Pump
600L/S
Transport Package
Standard Export Fumigation Sign Wooden Box Packagi
Specification
Vacuum quartz tube
Trademark
CYKY
Origin
Zhengzhou Henan China
HS Code
8412800090
Production Capacity
200 Sets Per Month

Product Description

1200C high vacuum CVD furnace with two heating zones for high temperature sintering and metal annealing



Product description of high vacuum CVD furnace

1200ºC two heating zone high vacuum CVD furnace with 3-channel mass flow meter CY-O1200-50IIT-3Z-HV consists of a two-heating zone tube furnace, a three-channel float flow meter and a high vacuum molecular pump set.

tube furnace
The two heating zones of the tube furnace on the CVD equipment are independently temperature controlled by the precision temperature control instrument. By adjusting the temperature of each temperature zone, the tube furnace can form two temperature gradients in the heating zone or form a long constant temperature zone. Each zone can be edited with 30 sections program of temperature rise and fall, with overheating and short circuit protection. The flanges on both sides of the furnace tube are equipped with a digital vacuum gauge and a mechanical pressure gauge, which can be used to control the atmosphere in the furnace tube. At the same time, the tube furnace is operated by high-definition true color touch screen, which is easy to use. Even non-professionals can master the use of the instrument after simple training, which can greatly improve your experiment efficiency.

mass flow meter
The CVD equipment is equipped with three-channel mass flowmeter, which has high precision and high reliability. It can accurately mix 1~3 channels of gas. The operation panel adopts digital display, which is intuitive and efficient. If you have special needs, you can contact the technician to customize any number of gas channels.
vacuum pump
The CVD equipment is also equipped with a precision molecular pump set, which can achieve a vacuum of 1.0E-3pa level, which can provide users with a purer and more stringent experimental environment than ordinary mechanical pumps.

1200ºC two heating zone high vacuum CVD equipment applications:
Our CVD equipment is suitable for high-temperature sintering, metal annealing, quality inspection, etc. in universities, research institutes, industrial and mining enterprises, especially for CVD experiments that require a variety of gas mixing atmospheres.

Technical parameters of high vacuum CVD furnace
Vacuum tube furnace Model CY-O1200-50IIT
Tube material High purity quartz
Tube diameter 50mm
Tube length 1000mm
Furnace chamber length 440mm
Heating zone length 200mm+200mm
Operating temperature 0~1100ºC
Temperature control   accuracy ±1ºC
Temperature control   mode 30 or 50 segment program temperature control
Display mode LCD
Sealing method 304 stainless steel vacuum flange
Flange interface 1/4" ferrule connector, KF16/25/40 joint
Vacuum 4.4E-3Pa
Power supply AC:220V 50/60Hz
Gas supply system Model CY-3Z
Gas channel 3-channel
Measuring unit Gas mass flow meter
Measuring range A channel: 0~100SCCM H2 gas Remarks: If you need   other ranges or gas types, you need to specify when ordering. According to the customer's specific requirements, the flow meter of the corresponding gas type and range can be selected.
B channel: 0~300SCCM N2 gas
C channel: 0~500SCCM Ar gas
measurement accuracy ±1.0%F.S
Pipe pressure   resistance 3MPa
Working pressure   difference 50~300KPa
Connecting pipe 304 stainless steel
Gas channel 304 stainless steel needle valve
Interface specification 1/4" ferrule connector for gas inlet and outlet
Exhaust system Model CY-GZK103-A
Molecular pump CY-600
Backing pump Rotary vane pump
Pumping rate Molecular pump: 600L/S Comprehensive gas   pumping performance: 30 minutes vacuum can reach: 1.0E-3Pa
Rotary vane pump: 1.1L/S
Pumping interface KF40
Exhaust interface KF16
Vacuum measurement Compound vacuum gauge: Resistance gauge + ionization gauge
Ultimate vacuum 1.0E-5Pa
Power supply AC:220V 50/60Hz
NOTE According to the needs of the experiment, you can choose the temperature, temperature zone, furnace size, vacuum system, flowmeter


Related photos of high vacuum CVD furnace

1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing



tube furnace
1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing

flow meter
1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing


high vacuum system


1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
Founded in 2005, Zhengzhou CY Scientific Instrument Co., Ltd. is a company specializing in the development and production of laboratory technology research equipment. The products are mixed, pressed, burned, cut, ground, polished, coated, analytical equipment and related consumables. Products include laboratory sintering equipment, coating equipment and so on. At present, it has been exported to 25 countries and regions such as the United States, Europe, and Southeast Asia, and has been well received by various scientific research units.

We have a mature technology research and development team, the number of technicians is 33, the company has 150 people, more than 500 square meters of office space, the factory covers an area of about 1,500 square meters located in Zhengzhou High-tech Zone Electronic Industrial Park. The products are mainly located in the research market, serving scientific research in the labs of universities and colleges, and can also customize products according to your needs.

1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing

1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing
1200c High Vacuum CVD Furnace with Two Heating Zones for High Temperature Sintering and Metal Annealing

Q. Are you a manufacturer or a trading company?
A. We are professional laboratory instrument manufacturers, have their own design team and factory, have mature technical experience, and can guarantee the quality of products and the optimal price.

Q. How is your company's product after-sales service system?
A. The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.

Q. How long is your delivery time? If I want to customize the instrument, how long does it take?
A.1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. It usually takes 30-60 days depending on the specifications of the custom instrument.

Q. Our country's power supply and plug are different. How do you solve it?
A. We can supply a transformer and plug according to your local requirements according to the power plug of different countries.

Q. How to pay?
A.T / T, L / C, D / P, etc., it is recommended to use Alibaba Trade Guarantee.

Q. How is the package of goods? Delivery methods?
A.1. Standard export fumigation sign wooden box packaging 2. Express, air, sea shipping according to customer requirements, find the most suitable way.

More questions, please contact customer service

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier