• High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
  • High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
  • High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
  • High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
  • High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
  • High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

Application: School, Lab
Customized: Customized
Certification: CE
Structure: Desktop
Material: Stainless Steel
Type: Tubular Furnace
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
CY-O1200-50IT-3F-HV
Vacuum Tube Furnace
High Purity Quartz
Tube Diameter
50mm
Tube Length
800mm
Heating Zone Length
400mm
Operating Temperature
0-1100c
Gas Supply System
Gas Float Flowmeter
Measurement Accuracy
+-0.2%
Ultimate Vacuum
1.0e-5PA
Molecular Pump
600L/S
Rotary Vane Pump
1.1L/S
Transport Package
Standard Export Fumigation Sign Wooden Box Packagi
Specification
Vacuum quartz tube
Trademark
CYKY
Origin
Zhengzhou Henan China

Product Description

high vacuum CVD tube furnace for lab high-temp sintering



Product description of high vacuum tube CVD furnace

1200ºC single heating zone high vacuum CVD system with 3-channel float flowmeter CY-O1200-50IT-3F-HV consists of a single heating zone tube furnace, a three-channel float flow meter and a high vacuum molecular pump set.

tube furnace
The tube furnace is controlled by the precision temperature control instrument for PID temperature control. It can edit the 30-segment raising and falling temperature program and has the function of overheating and short circuit protection. The flanges on both sides of the furnace tube are equipped with a digital vacuum gauge and a mechanical pressure gauge, which can be used to control the atmosphere in the furnace tube. At the same time, the tube furnace is operated by high-definition true color touch screen, which is easy to use. Even non-professionals can master the use of the instrument after simple training, which can greatly improve your experiment efficiency.


flow meter
The system is equipped with a three-channel float flowmeter, which can mix 1~3 channels of gas to accurately prepare the mixed gas required for the experiment. Another pressure gauge is installed on the front of the float flowmeter to monitor the gas pressure and the mixing tank pressure.
high vacuum
This system is also equipped with a precision molecular pump set, which can achieve a vacuum of 1.0E-3pa level, which can provide users with a purer and more stringent experimental environment than ordinary mechanical pumps.

applications:
It is suitable for high-temperature sintering, metal annealing, quality inspection, etc. in universities, research institutes, industrial and mining enterprises, especially for CVD experiments that require a variety of gas mixing atmospheres.



Technical parameters of high vacuum tube CVD furnace
Vacuum tube   furnace Model CY-O1200-50IT
Tube material High purity quartz
Tube diameter 50mm (Optional 60mm/80mm/100mm)
Tube length 800mm
Furnace chamber   length 440mm
Heating zone   length 400mm
Constant   temperature zone 200mm
Operating   temperature 0~1100ºC
Temperature   control accuracy ±1ºC
Temperature   control mode 30 or 50 segment program temperature control
Display mode LCD
Sealing   method 304 stainless steel vacuum flange
Flange   interface 1/4" ferrule connector, KF16/25/40 joint
Vacuum 4.4E-3Pa
Power supply AC:220V   50/60Hz
Gas supply system Model CY-3F
Gas channel 3-channel
Measuring   unit Gas float flow meter
Measuring range A channel: 0~100ml/min  H2 gas Remarks: If   you need other ranges or gas types, you need to specify when ordering.   According to the customer's specific requirements, the flow meter of the corresponding gas type and range can be selected.
B channel: 16~160 ml/min  N2 gas
C channel: 25~250 ml/min  Ar gas
Measurement   accuracy ±2.0%
Pipe   pressure resistance 3MPa
Working   pressure difference 50~300KPa
Connecting   pipe 304 stainless steel
Control   valve 304 stainless steel needle valve
Interface   specification 1/4" ferrule connector for gas inlet and outlet
Exhaust   system Model CY-GZK103-A
Molecular   pump CY-600
Backing pump Rotary vane pump
Pumping rate Molecular pump: 600L/S Comprehensive gas pumping performance: the vacuum can reach 1.0E-3Pa in 30 minutes.
Rotary vane pump: 1.1L/S
Pumping   interface KF40
Exhaust   interface KF16
Vacuum   measurement Compound vacuum gauge: Resistance gauge + ionization gauge
Ultimate   vacuum 1.0E-5Pa
Power supply AC:220V   50/60Hz
NOTE: According to the needs of the experiment, you can choose the temperature, temperature zone, furnace size, vacuum system, flowmeter


Related photos of high vacuum CVD furnace


High Vacuum CVD Tube Furnace for Lab High-Temp Sintering tube furnace
High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

flow meter
High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

high vacuum pump
High Vacuum CVD Tube Furnace for Lab High-Temp Sintering



High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
Founded in 2005, Zhengzhou CY Scientific Instrument Co., Ltd. is a company specializing in the development and production of laboratory technology research equipment. The products are mixed, pressed, burned, cut, ground, polished, coated, analytical equipment and related consumables. Products include laboratory sintering equipment, coating equipment and so on. At present, it has been exported to 25 countries and regions such as the United States, Europe, and Southeast Asia, and has been well received by various scientific research units.

We have a mature technology research and development team, the number of technicians is 33, the company has 150 people, more than 500 square meters of office space, the factory covers an area of about 1,500 square meters located in Zhengzhou High-tech Zone Electronic Industrial Park. The products are mainly located in the research market, serving scientific research in the labs of universities and colleges, and can also customize products according to your needs.

High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

High Vacuum CVD Tube Furnace for Lab High-Temp Sintering
High Vacuum CVD Tube Furnace for Lab High-Temp Sintering

Q. Are you a manufacturer or a trading company?
A. We are professional laboratory instrument manufacturers, have their own design team and factory, have mature technical experience, and can guarantee the quality of products and the optimal price.

Q. How is your company's product after-sales service system?
A. The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.

Q. How long is your delivery time? If I want to customize the instrument, how long does it take?
A.1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. It usually takes 30-60 days depending on the specifications of the custom instrument.

Q. Our country's power supply and plug are different. How do you solve it?
A. We can supply a transformer and plug according to your local requirements according to the power plug of different countries.

Q. How to pay?
A.T / T, L / C, D / P, etc., it is recommended to use Alibaba Trade Guarantee.

Q. How is the package of goods? Delivery methods?
A.1. Standard export fumigation sign wooden box packaging 2. Express, air, sea shipping according to customer requirements, find the most suitable way.

More questions, please contact customer service

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now